r3
Details
-
FilenameEnhancedCalendar-r3.zip
-
Uploaded by
-
UploadedDec 12, 2008
-
Size107.02 KB
-
Downloads21
-
MD5d308dedf4fbc30ce11c378597cbadac1
Supported WoW Retail Versions
- 3.0.3
Changelog
------------------------------------------------------------------------
r3 | pericles | 2008-12-12 11:59:07 +0000 (Fri, 12 Dec 2008) | 2 lines
Changed paths:
A /trunk/.pkgmeta
EnhancedCalendar: -
Add pkgmeta file
------------------------------------------------------------------------
r2 | pericles | 2008-12-12 11:57:50 +0000 (Fri, 12 Dec 2008) | 2 lines
Changed paths:
M /trunk
A /trunk/EnhancedCalendar.lua
A /trunk/EnhancedCalendar.toc
A /trunk/Locales
A /trunk/Locales/Locale-enUS.lua
A /trunk/Locales/Locales.xml
A /trunk/Options.lua
A /trunk/embeds.xml
EnhancedCalendar: -
Commit initial empty framework to get project under version control.
------------------------------------------------------------------------
r1 | root | 2008-12-12 11:40:15 +0000 (Fri, 12 Dec 2008) | 1 line
Changed paths:
A /branches
A /tags
A /trunk
"enhancedcalendar/mainline: Initial Import"
------------------------------------------------------------------------